How many days do you need?
The most important planning decision on Kilimanjaro: how we count days on the mountain, why longer is better, and three ways to add time.
This is the single most important planning decision you will make about Kilimanjaro, which is why it has a chapter to itself. Two ideas sit behind everything else in this guide, and both are worth understanding before you book.
We count days on the mountain, and a day is a day of walking
Operators label their climbs by total trip length (a “6-day Machame”, a “7-day Lemosho”) but those numbers often fold in the day you fly in, the day you fly out, and sometimes road transfers or a safari as well. A package sold as “8 days” might be only a six-day climb once you strip the travel out. What matters for your body is the time you spend walking and sleeping high on the mountain, so that is what we count.
Throughout this guide, a route’s length is the number of days you actually walk on the mountain, gate to gate, and that is always one more than the number of nights you camp, because you walk in on the first day and walk out on the last. A seven-day route means seven days of walking and six nights on the mountain; a six-day route is six days of walking and five nights. The nights you spend in a hotel in Moshi or Arusha before and after the climb are never part of the count. When you read an operator’s itinerary, do the same (count the walking days on the mountain, or the camping nights plus one) so you compare every route and every quote on the same footing.
Longer is better on Kilimanjaro
Kilimanjaro is a walk-up. There is no technical difficulty to speak of, so the real obstacle between you and the summit is altitude, and the cure for altitude is time. Every extra night you spend on the mountain gives your body more chance to adapt to the thinning air, which means a higher chance of reaching the top and, just as importantly, a safer and more enjoyable climb along the way.
Our guidance is plain: seven days on the mountain is a sensible minimum, and eight, nine or ten is better still. This guide presents every route at its longer, well-acclimatized length rather than the aggressive minimum an operator might quote to keep the price down. The extra days are not luxury, they are the cheapest insurance you can buy against being turned around sick a few hundred metres below the summit.
Three ways to add time
When you want to lengthen a climb (and you usually should) there are three ways to do it, and the route chapters flag where each one fits:
- An official longer variation: many routes have a standard longer version that simply adds a night, often an extra acclimatization camp (for example the extra night at Karanga on Machame, or the night at Mawenzi Tarn on Rongai).
- Splitting a long stage into two shorter days: some big days can be broken into two, giving you a gentler climb and an extra night at altitude.
- A rest or acclimatization day: an added day at a camp, usually with a “walk high, sleep low” day hike, you climb to a higher point during the day and return to sleep low, which is one of the most effective ways to acclimatize.
Each route chapter notes where a longer variation exists, where a stage can be split, and where a rest day with a day hike naturally fits. Use them to build the longest version of your chosen route that your time and budget allow.
The most common reason people fail to summit Kilimanjaro (and the most common reason they get dangerously ill) is too few days on too fast a route. If you take one thing from this guide, take this: give yourself more days.
